.
.
.
.
.
.
.
.
Iris Power
  • Products
    • Hydro-Generator Assessment
    • Turbo-Generator Assessment
    • SwitchGear Assessment
    • Motor Assessment
    • All Products (Alphabetical)
    • The Complete Line of Products 2013 (PDF)
  • Services
    • Field Services
    • Rotating Machines Technical Services
    • TracCheck Services
    • Repair & Calibration of Iris Instruments
    • Repair & Calibration of ADWEL Instruments
  • News
    • Diagnostic News Spring 2013
  • The latest edition of this informative newsletter is now available

    Learn More

  • New Products

    EVTracII Stator Endwinding Vibration Monitor SWA Stator Wedge Tightness Detector MCPDTracII PD Monitor for Distribution Class Switchgear MarineTracII PD Monitor for Ship Generators and Motors BusTracII Turbo Generator PD Monitor HydroTracII Hydro Generator PD Monitor PDTracII Motor PD Monitor AGTracII Measure the air gap between the Rotor and Stator
  • Events & Training
  • Technical Papers
  • Newsletters
    • Diagnostic News
    • Outage Planning News
  • Case Studies
  • Downloads
  • Discussion Forum by IGTC

  • Turbo-Generator FAILURE PREVENTED
  • Hydro-generator
  • Motor SAVED
  • TIso-Phase Duct: FAILURE PREVENTED

Solve in one move contact Iris Power

Sign

Solve in one move contact Iris Power

High PD activity ...

Problem

Solve in one move contact Iris Power

... lead to uncovering a critical problem - the incorrectly installed wedges

CLOSE

PROBLEMS IN HYDROGEN COOLED GENERATOR REVEALED

Company: Midwest US Utility
Ratings: 173 MW, 18 kV, Hydrogen Cooled Turbine Generator, 3 years in operation
Manufacturer: Confidential
Related Info: 25 years old
PD Sensors: Two bus couplers per phase
Case Study Details:"... With the high H2 pressure (30-35 psig) the [PD] levels were expected to be very low but instead were very high after only a year of operation. We initially expected to find problems with the couplers as we did not believe the results..."

Click here to read more

216 CONFIRMED PROBLEMS WERE DETECTED WITH ON-LINE PD TEST

  • Contamination: 10
  • Vibration: 54
  • Design/Manufacturing: 127
  • Operation/Maintenance: 12
  • Non-Generator: 13
  • Total: 216

Click here to read more

Sign

Solve in one move contact Iris Power

High PD activity (slot discharge)...

Problem

Solve in one move contact Iris Power

...was a foresign of an upcoming failure

CLOSE

HYDRO GENERATOR WITH VERY HIGH PD FAILED IN-SERVICE

Company: Western Canadian Utility
Ratings: 184 MVA, 13.8 kV, Air Cooled Hydro Generator
Manufacturer: Confidential
Related Info: 25 years old
PD Sensors: Four PDA Couplers per phase
Case Study Details: The PD data for this unit has been trended for over ten years. In 1995, semi-conducting paint and CRTV were injected into selected bars ...

Click here to read more

216 CONFIRMED PROBLEMS WERE DETECTED WITH ON-LINE PD TEST

  • Contamination: 10
  • Vibration: 54
  • Design/Manufacturing: 127
  • Operation/Maintenance: 12
  • Non-Generator: 13
  • Total: 216

Click here to read more

Sign

Solve in one move contact Iris Power

Intelligent on-line signature analysis...

Problem

Solve in one move contact Iris Power

...revealed broken rotor bars

CLOSE

BROKEN ROTOR BARS IN CONDENSATE PUMP MOTOR DETECTED

Company: A large utility in the US northeast
Ratings: 3000hp, 6.6kV 1785rpm Motor
Manufacturer: Confidential
Case Study Details: The suspicion arose from a constant hum during motor operation and abnormal vibration levels during start-up and running. The plant vibration monitoring system did not have the ability to zoom...

Click here to read more

Sign

Solve in one move contact Iris Power

High level system PD noise...

Problem

Solve in one move contact Iris Power

...uncovered a well-developed tracking

CLOSE

HEAVILY TRACKED BUSHING DETECTED

Company: Italian utility
Ratings: 390 MW, 20kV, Hydrogen Cooled Turbine Generator
Manufacturer: Confidential
Related Info: Installed in 1970
PD Sensors: Two Bus Couplers per phase
Case Study Details: During a partial discharge measurement using the TGA-B portable instrument, high levels of PD activity (over 3000mV position, well above the highest range, see Figure 1) were detected on the C phase outside...

Click here to read more

216 CONFIRMED PROBLEMS WERE DETECTED WITH ON-LINE PD TEST

  • Contamination: 10
  • Vibration: 54
  • Design/Manufacturing: 127
  • Operation/Maintenance: 12
  • Non-Generator: 13
  • Total: 216

Click here to read more

Sign

Solve in one move contact Iris Power

Reading Instability...

Problem

Solve in one move contact Iris Power

...uncovered internal bad connection on a new transformer

CLOSE

BAD INTERNAL CONNECTION TO BUSHINGS UNCOVERED

Company: US North-West utility
Ratings: 45 MVA power transformer
Manufacturer: Confidential

A customer was commissioning a new 45 MVA power transformer delivered by an overseas manufacturer. During the test, ADWEL's Digital Winding Resistance ReporteR, DWR-10, was consistently issuing a warning of current interruptions, and did not complete the test. Another DWR-10 instrument was used with similar outcome. All other standard measurements, including TTR, Tan-Delta and insulation resistance indicated acceptable resistance value.

Nevertheless, the customer drained the oil and inspected the transformer to detect that the windings on all 3 phases were not properly secured to the bushings. Had the transformer been energized, a catastrophic failure could have occurred.

Click here to learn more on DWR-10

日本語パンフレット

  • BusTrac パンフレット - PDF
  • EMC パンフレット - PDF
  • HydroTrac パンフレット - PDF
  • PDA-IV パンフレット - PDF
  • PDTrac II パンフレット - PDF
  • HydroTrac パンフレット - PDF
  • SSC パンフレット - PDF
  • TFProbe パンフレット - PDF
  • TGA-B パンフレット - PDF
  • TGA-S パンフレット - PDF
  • TGA-B パンフレット - PDF
  • TGA パンフレット - PDF

©Copyright IRIS POWER 2010 All Rights Reserved Privacy Statement

Website by:Snap Design and Hosting