.
.
.
Iris Power
  • Home
  • PDTech
  • Qualitrol
  • IRMC
  • QCMC
  • Company
  • Contact
  • Products
    • Hydro-Generator Assessment
    • Turbo-Generator Assessment
    • Motor Assessment
    • All Products (Alphabetical)
    • The Complete Line of Products 2011 (PDF)
  • Services
    • Field Services
    • Rotating Machines Technical Services
    • Contract R&D Services
    • TracCheck Services
    • Repair & Calibration of Iris Instruments
    • Repair & Calibration of ADWEL Instruments
  • Manufacturer's Representatives
  • News
  • Diagnostic News Winter 2012

    January 23, 2012
    The latest edition of this informative newsletter is now available

    Learn More

  • IRMC 2012 - Call For Papers


    Iris Power will be hosting the 15th Annual Iris Rotating Machine Conference (IRMC) June 25-28, 2012, in Las Vegas, Nevada. This annual conference is attended by industry professionals from around the world.

    Learn More

  • Iris introduces an extended suite of off-line testing and diagnostic tools for condition assessment of rotating machines manufactured by its sister company PDTech, a Qualitrol company

    August 25th, 2010

    DELTAMAXX®15
    Digital Loss Factor and Capacitance Analyser for Test Voltages up to 15kV

    Learn More


    DRA-3
    Dielectric Response Analyzer

    Learn More

  • Events & Training
  • Technical Papers & Newsletters
    • Technical Papers
    • Newsletters
  • Case Studies
  • Downloads
  • Discussion Forum by IGTC

  • Turbo-Generator FAILURE PREVENTED
  • Hydro-generator
  • Motor SAVED
  • TIso-Phase Duct: FAILURE PREVENTED

Solve in one move contact Iris Power

Sign

Solve in one move contact Iris Power

High PD activity ...

Problem

Solve in one move contact Iris Power

... lead to uncovering a critical problem - the incorrectly installed wedges

CLOSE

PROBLEMS IN HYDROGEN COOLED GENERATOR REVEALED

Company: Midwest US Utility
Ratings: 173 MW, 18 kV, Hydrogen Cooled Turbine Generator, 3 years in operation
Manufacturer: Confidential
Related Info: 25 years old
PD Sensors: Two bus couplers per phase
Case Study Details:"... With the high H2 pressure (30-35 psig) the [PD] levels were expected to be very low but instead were very high after only a year of operation. We initially expected to find problems with the couplers as we did not believe the results..."

Click here to read more

216 CONFIRMED PROBLEMS WERE DETECTED WITH ON-LINE PD TEST

  • Contamination: 10
  • Vibration: 54
  • Design/Manufacturing: 127
  • Operation/Maintenance: 12
  • Non-Generator: 13
  • Total: 216

Click here to read more

Sign

Solve in one move contact Iris Power

High PD activity (slot discharge)...

Problem

Solve in one move contact Iris Power

...was a foresign of an upcoming failure

CLOSE

HYDRO GENERATOR WITH VERY HIGH PD FAILED IN-SERVICE

Company: Western Canadian Utility
Ratings: 184 MVA, 13.8 kV, Air Cooled Hydro Generator
Manufacturer: Confidential
Related Info: 25 years old
PD Sensors: Four PDA Couplers per phase
Case Study Details: The PD data for this unit has been trended for over ten years. In 1995, semi-conducting paint and CRTV were injected into selected bars ...

Click here to read more

216 CONFIRMED PROBLEMS WERE DETECTED WITH ON-LINE PD TEST

  • Contamination: 10
  • Vibration: 54
  • Design/Manufacturing: 127
  • Operation/Maintenance: 12
  • Non-Generator: 13
  • Total: 216

Click here to read more

Sign

Solve in one move contact Iris Power

Intelligent on-line signature analysis...

Problem

Solve in one move contact Iris Power

...revealed broken rotor bars

CLOSE

BROKEN ROTOR BARS IN CONDENSATE PUMP MOTOR DETECTED

Company: A large utility in the US northeast
Ratings: 3000hp, 6.6kV 1785rpm Motor
Manufacturer: Confidential
Case Study Details: The suspicion arose from a constant hum during motor operation and abnormal vibration levels during start-up and running. The plant vibration monitoring system did not have the ability to zoom...

Click here to read more

Sign

Solve in one move contact Iris Power

High level system PD noise...

Problem

Solve in one move contact Iris Power

...uncovered a well-developed tracking

CLOSE

HEAVILY TRACKED BUSHING DETECTED

Company: Italian utility
Ratings: 390 MW, 20kV, Hydrogen Cooled Turbine Generator
Manufacturer: Confidential
Related Info: Installed in 1970
PD Sensors: Two Bus Couplers per phase
Case Study Details: During a partial discharge measurement using the TGA-B portable instrument, high levels of PD activity (over 3000mV position, well above the highest range, see Figure 1) were detected on the C phase outside...

Click here to read more

216 CONFIRMED PROBLEMS WERE DETECTED WITH ON-LINE PD TEST

  • Contamination: 10
  • Vibration: 54
  • Design/Manufacturing: 127
  • Operation/Maintenance: 12
  • Non-Generator: 13
  • Total: 216

Click here to read more

Sign

Solve in one move contact Iris Power

Reading Instability...

Problem

Solve in one move contact Iris Power

...uncovered internal bad connection on a new transformer

CLOSE

BAD INTERNAL CONNECTION TO BUSHINGS UNCOVERED

Company: US North-West utility
Ratings: 45 MVA power transformer
Manufacturer: Confidential

A customer was commissioning a new 45 MVA power transformer delivered by an overseas manufacturer. During the test, ADWEL's Digital Winding Resistance ReporteR, DWR-10, was consistently issuing a warning of current interruptions, and did not complete the test. Another DWR-10 instrument was used with similar outcome. All other standard measurements, including TTR, Tan-Delta and insulation resistance indicated acceptable resistance value.

Nevertheless, the customer drained the oil and inspected the transformer to detect that the windings on all 3 phases were not properly secured to the bushings. Had the transformer been energized, a catastrophic failure could have occurred.

Click here to learn more on DWR-10

Technical Papers

Select Topic:

File Name
eic 09 - stator winding hipot testing.pdf
hydro 05 - important considerations for specifying new hydrogen sw.pdf
hydroreview 93 - using diagnostic technology for identyfying generator winding maintenance needs.pdf
partial discharge testing - a progress report - irmc 2009.pdf
partial discharge testing - a progress report - irmc 2010.pdf
partial discharge testing - a progress report - irmc 2011.pdf
recent problems experienced with motor and generator windings - ieee ppic - 2009-06 sep 2009.pdf

©Copyright IRIS POWER 2010 All Rights Reserved Privacy Statement

Website by:Snap Design and Hosting